A new manufacturing complex needed a high-capacity main distribution board compliant with Premier Energy connection requirements, delivered on a tight schedule so the plant start-up would not be delayed.
We designed and assembled a 4000 A VRU switchboard in our own workshop, with copper busbars, sectioning and selective protections. Every circuit was 100% tested before shipment, and the documentation was prepared for acceptance by the energy provider.
The switchboard was delivered and energized on time, with no non-conformities at acceptance. The complex was connected to the grid on schedule, with spare capacity for future expansion.
4000 A · SM EN 61439Equipment and specifications
- 01
Rated current 4000 A
- 02
Copper busbars · IP31 indoor
- 03
Compliance with SM EN 61439-1/-2
- 04
100% testing and Premier Energy acceptance documentation